Define the machine
Confirm the material, working environment, machine envelope, hourly output, power supply and service requirements before detailed design begins.
Design, build and verify
Develop the mechanical structure and production route, build the prototype, test operation and output, and record the changes needed before the approved version moves forward.
Prepare to repeat
Retain the confirmed bill of materials, work instructions, inspection points, brand treatment and packaging requirements for future production.
For an African customer, we received a machine-size limit and an hourly output requirement rather than production drawings. We independently developed the equipment, verified the required output in operating tests, and delivered 200 machines per month for six months, for a total of 1,200 units. Customer identity and project files remain confidential.